Erratum to:Modular supervisory control for multi-floor manufacturing processes

2023-12-01 09:51FotisKoumboulisDimitriosFragkoulisAristidesMichos
Control Theory and Technology 2023年4期

Fotis N.Koumboulis·Dimitrios G.Fragkoulis·Aristides A.Michos

In the published article Figs.1 and 2 should be shown as follows.

Fig.1 Top view of the i-th floor of the manufacturing process (horizontal material handling)

Fig.2 Side view of the i-th floor of the manufacturing process(vertical material handling)

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License,which permits use,sharing,adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made.The images or other third party material in this article are included in the article’s Creative Commons licence,unless indicated otherwise in a credit line to the material.If material is not included in the article’s Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitteduse,youwillneedtoobtainpermissiondirectlyfromthecopyright holder.To view a copy of this licence, visit http://creativecomm ons.org/licenses/by/4.0/.